Division of Capital Asset Management (DCAM)
Since 2002, Nobis has conducted a variety of environmental and geotechnical services for DCAM under a Master Services Agreement.
Belchertown State School, Belchertown, MA
Conducted a confirmatory asbestos and hazardous material survey in five abandoned buildings. Hazardous materials included bottom ash, abandoned drums and above ground storage tanks (ASTs), PCB containing transformers, and PCB light ballasts.Multi-Site Assessment, Concord, Sutton, Middleboro, MA
Multi-site assessments using the American Society of Testing and Materials (ASTM) guidelines. The four sites required rapid turnaround during the winter with follow-up visits after the snow melted to assess for anything that may have been covered during the initial assessment.
Phase I Site Investigation and Tier Classification, Former Boston City Hospital, Mattapan, Boston, MA
Provided a Phase I Site Investigation and Tier Classification under the Massachusetts Contingency Plan (MCP) with subsurface exploration of soil and groundwater. This portion of a larger old demolished city hospital facility has soil contamination consisting of polycyclic aromatic hydrocarbons (PAHs) and metals.
Limited Asbestos Survey, Salem, MA
Quick turnaround, interior asbestos assessment of a portion of the Salem facility.North Street/Bridge Street Ramp Re-Alignment, Salem, MA
Conducted geotechnical investigation, settlement analysis of marine clays and prepared a geotechnical data report for the re-alignment of North Street.
